We always strive to provide the best quality products to our esteemed clients. We have chalked out a quality assurance plan, which is given below:-
Quality Assurance Plan
1). Checking of Basic Raw materials & components.
Sheet Steel- For size & surface finish.
Electrical Stampings - check for surface finish, weight, size, cut edge, orientation direction for CRGO steel. Thickness-must be burr free, smooth.
Structural steel- For hardness, thickness and edge finish, size &straightness, rustfree. Hardware to be checked for size & finish of plating.
2) Copper ConductorÂ
Bar-Strips-softness, size, weight, straightness & conductivity-check resistance per meter &verify for electrolytic grade, edge should be burr free. Manufacturers test certificate.
Enamelled or DGC conductor-Size of bare conductor, thickness &quality of insulation, weight, softness (wind ability), continuity, conductivity, Res per meter & velocity for electrolytic grade. Manufacturers test certificate.
Insulating materials-Quality, thickness & size of material finish & conduct high voltage break down test on sample pieces, insulated PVC or other wires for voltage grade, size &ISI mark. Manufacturers test certificate.
Bought out standard components-rating & make finish & manual & electrical operation on no load contact make & break by multimeters.
Insulating varnish & paint-make, packing & date of expiry check proper flow & viscosity when using proper thinner. Use stoving temperature only as per manufacturers’ instruction.
Quality Cheek During Mfg. Process
During Fabrication - Proceed as per approval drawing finish of bends & welding to be smooth & burr free. Use hand tools & machines with dies with care and proper tooling, final assembly to be matched with drawing.
Cheek chemical properties of solution of various tanks raise temperatures as required. Strictly follow the surface treatment procedure 7 tank namely degreasing, rinsing, Picklingrinshing, phosphatising, rinsing and passivating final surface finish to be lustrous Grey.
Raise temperature of stoving oven to above 1800C. Spray the powder of specified shade.
Cure the job sprayed with powder for 10 minutes at 1800C.
Quality Check For Testing Equipment
Equipments are calibrated once in a year from Govt. Lab (Govt. Engg. College)
Testing equipments are kept in proper packing/condition to ensure accurate result while testing.
|